North vocational school center in Darmstadt, 1st construction phase

The vocational school center with its distinctive shed roofs is located on a huge, flat cultivated field that extends over an area of around 100 x 100 metres. The merging of the schools on the existing, dense construction site also corresponds to the content: The existing structure is taken up and reinterpreted, the development principle is reversed.

more

The new entrance is located on the east side and faces the green area. There, together with the new canteen building, a new entrance square is created, which merges into the green space. The three independent vocational schools of the Schulzentrum Nord – the Heinrich-Emanuel-Merck-Schule (built 1985), the Martin-Behaim-Schule (built 1978) and the Friedrich-List-Schule (built 1983) – are to be merged into one organisational unit. For this purpose, the existing borders in the main development axis will be abolished, the magistral will be strengthened and a connection between the three buildings will be developed.
In addition, the organisation of rooms according to functional areas and not according to individual vocational schools enables a stronger unity of the school centre. In order to meet the requirements of contemporary teaching, the spatial structure will be comprehensively restructured and a range of different learning areas, such as learning landscapes, will be created.
The refurbishment is being carried out in three construction phases, the middle block has already been completed.

less

Competition with subsequent VOF procedure
06 2016 / 1. Preis

Start of planning
09 2016

Completion 1st construction phase
09 2020

Client
Wissenschaftsstadt Darmstadt
represented by Projektmanagement
Darmstädter Stadtentwicklungs GmbH & Co.KG (DSE)

Location
Alsfelder Straße 23, 64289 Darmstadt

more

Service phases
1-9

Planning team
Ingmar Menzer (partner in charge), Coskun Kocak (project leader), Harald Baumann (project leader), Miriam Baehrens, Gisela Dierolf, Lisa Eppel, Florian Fehrenbacher, Katharina Gnädig, Anke März-Sulzberger, Simone Reisch

Construction management
schneider + schumacher Verwaltungsgesellschaft mbH, Frankfurt/Main

Structural planning
Prof. Kind & Partner, Wiesbaden

Landscape design
Jetter Landschaftsarchitekten, Stuttgart

Wayfinding system
Schramke Design, Berlin

Photos
© Markus Guhl for wulf architekten

see ongoing project

less